Atrašanās vieta: Dubai, Apvienotie Arābu Emirāti
The Al Habtoor City Towers are 3 high-rise buildings in Dubai which are simultaneously being realized, eventually reaching heights of around up to 300 m.
Al Habtoor Leighton Group (HLG), Dubai
PERI´s ACS system has once again proved its uniqueness. We can safely and quickly realize our very complicated core wall as well as in a very high quality with the ACS without having to utilize the crane. This is a big advantage on our construction site.
The most important part of the PERI complete solution is the climbing formwork concept for high-rise building cores. A systematic, ongoing work process is achieved with the ACS self-climbing technology and the VARIO GT 24 girder wall formwork.
The core and retaining walls are climbed in advance with ACS and VARIO without having to utilize a crane. With the help of the ACS self-climbing system, also two concrete placing booms are carried along for each high-rise building core.